Choose the sample closest to your work
- Use the shed PDF to see how a small rectangular footprint sits behind a house. Look for the named distances between the improvement and lot edges. A shed with doors opening onto a path may need the path or access route shown too if your reviewer asks.
- Use the fence PDF to label a line rather than a building footprint. Work out where the fence begins, ends, changes direction, or contains a gate. The example helps you set up the drawing while your survey or accepted property record supplies the location of the lot edges.
- Use the deck PDF to see how a footprint relates to the house. If your project includes steps or a landing, compare the top-down outline with the builder’s drawings. A footprint cannot explain the complete framing or elevation, which may belong in the construction set.
- Portland and Minneapolis publish their own site plan instructions and examples. If your office supplies a mandatory form, use that layout for the application and use these samples to learn how the dimensions and separate features read on the page.
Copy this field checklist
- Title block. Write the project name, property address, sheet date and scale. Put a parcel identifier or owner details on the drawing only if the instructions request them. Keep street spelling and lot identifiers consistent with the separate application.
- Lot and street. Draw the complete parcel with dimensions on each applicable edge. Add the north arrow and street or alley names. Leave room outside the boundary for the largest dimension labels rather than placing every label on the interior.
- Existing features. Label the house, structures and paving that help locate the change. Add recorded easements, utilities, access or significant site features when the checklist needs them. Use the correct record to locate an easement, not the path a utility appears to take.
- Proposed work. Give the new element a recognizable label and actual dimensions. Show additions and removals with distinct line types or notes. Draw the feature that needs review including a landing, overhang, or gate when the reviewing office wants it marked.
- Clearances and area. Show the actual distance from the relevant new edge to the property line or nearby structure. Use a separate legend or worksheet for area categories if required. Give each measurement a purpose and leave enough white space for it to be read.
Replace the example with your own drawing
- Begin with verified lot dimensions. Enter width and depth only if the lot matches a rectangle. For other lots, use a trusted reference to trace or enter each boundary segment. Do not stretch the example sheet to force a shape to fit your property.
- Choose an address in SitePlanDesk when you want an aerial reference. If a suitable house footprint is available, an editable estimate can appear automatically. Compare it with your current reference and correct or remove it. Add the lot line yourself from verified information.
- Place the planned object and enter its size. Then use the relevant edge clearance input to place it at the intended number of feet from the boundary. Check the other affected edges after a move, especially at a corner lot or where the proposed work is angled.
- Add a small number of notes where they help the reviewer find a change. A useful note points to one item and describes it directly. Put longer construction notes in the companion set if the city asks for them; too much text can hide dimensions on the site drawing.
Check the scale and assemble the permit files
- Look at the new PDF rather than comparing only with the example in the browser. Check paper size, title, scale, lot lines, every callout, and whether the whole drawing fits. Inspect the closest group of labels at both normal reading size and zoom.
- Print one trial sheet at actual size if you plan to submit on paper. Measure a dimension with a ruler or scale. A 20-foot span at one inch equals 20 feet should print as one inch. A portal preview cannot tell you how your local printer will scale it.
- Keep separate required files separate. Your site drawing shows the proposed placement. A survey can establish the boundary, an elevation can show height, and a detail can explain construction. Use each required file, with an identifying date and the same project name.
- For a final check, ask someone unfamiliar with the work to point to the new feature and read its nearest clearance without you explaining. If they point to the wrong edge, change the label or add a leader before uploading the file.
Questions
Still stuck? Write to us.
Are the sample site plan PDFs free?
Yes. You can open or download the public samples without payment or an account. They illustrate the layout for a shed, fence, or deck and use example geometry.
Can I submit a sample PDF with my permit?
Use your own scaled drawing based on real measurements for the application. These are completed examples, not reusable property documents. Confirm what your permit office accepts before ordering or exporting.
Can I start the drawing for free?
Yes. Draw and preview for free. Payment unlocks a clean PDF for your project. Every exported drawing is non-certified, and the tool cannot validate the legal boundary.
What if my permit office has its own template?
Use the office’s required format. Check its paper size, scale, labeling and signatures separately. The sample sheets are useful for learning to read and organize placement dimensions.