Not a licensed boundary survey.Do I need a survey?

SitePlanDesk

Houston, TX Site Plan Requirements & Building Permit Guide

Houston Public Works lists a building permit exemption for a one-story detached accessory structure of up to 120 square feet, except storm shelters. Houston has no zoning districts. Check the recorded plat, any special minimum building line and the permit checklist before you pick the structure location.Source ↗

Start a site planFree · no account

For tracing only. Never printed.

Houston setbacks and permit thresholds

Check the scope before using a number on your site plan.
Work or districtLimitWhen it applies
Front, side and rear placementConfirm the recorded lines for this lotHouston has no citywide residential zoning table. Pull the recorded subdivision plat and check any special minimum building line. Ask Planning about unresolved distances.Source ↗
One-story detached shedUp to 120 sq ft floor areaStorm shelters are excluded. Review the city checklist for site and other permits.Source ↗
Fence permit exemptionUp to 8 ft highApplies to fences without masonry, concrete or electrical energizing under the listed building-code exemption.Source ↗
Detached deck exemptionUp to 200 sq ft and 30 in above grade throughoutNo attachment to the house and no service to the required exit door.Source ↗

Permit office and application

Houston Public Works identifies iPermits in the residential checklist for the application and Electronic Plan Review for transmitting drawings. The city also provides the Houston Permit Portal for public permitting information.Source ↗

  • Planning reviews residential site plans for applicable development rules, including setbacks and access. It also checks plats for building lines under Chapter 42.Source ↗
  • Special Minimum Building Line protections are neighborhood-specific. Read the city program information and check the property record before relying on a number from another block.Source ↗

Read the plat before drawing the yard

  • Find the lot and block on the recorded plat, and label any building line separately from the property line.
  • Ask Planning which line applies on a two-street lot, and check deed restrictions and HOA rules separately.

Show drainage and keep revisions traceable

  • Show runoff toward ditches, culverts or curb inlets, and ask about drainage review when the map shows a flood hazard.
  • Keep the address and proposed scope consistent across files, and give replacement sheets a revision date.

Questions

Still stuck? Write to us.

[email protected]
Does Houston’s lack of zoning mean I can build to the property line?

No. Recorded building lines, development ordinances, easements and private restrictions can still matter. Ask Planning to confirm the applicable line for the project.

Do I draw the apron if I am extending the driveway?

Show where the pavement meets the curb or street. Label the new and existing sections so staff can tell whether the approach in the public right-of-way will change.

What if I cannot find the plat?

Start with the lot and block description from the closing documents. Ask the permit office which drawing or record it can check for a building line.

Draw your Houston site plan today

Free to draw and preview. No account. Pay $29 only when you want the clean PDF.