Not a licensed boundary survey.Do I need a survey?

SitePlanDesk

Shed permit guide

Shed Permit Requirements and How to Draw the Site Plan

Shed permit requirements depend on how your city measures the shed. Austin’s exemption uses up to 200 square feet of floor area for qualifying detached sheds, with height and use limits. San Diego uses up to 120 square feet of projected roof area. Check your city before you order.Source ↗

Start a site planFree · no account

For tracing only. Never printed.

When you may need a permit

  • Austin: up to 200 sq ft of floor area and 15 ft high for a qualifying detached, one-story shed. The exemption excludes dwellings, plumbing and flood hazard areas.Source ↗
  • Houston: up to 120 sq ft of floor area for a one-story detached accessory structure, excluding storm shelters.Source ↗
  • San Diego: up to 120 sq ft of projected roof area for a qualifying ground-supported storage shed, with use and special-site exceptions.Source ↗
  • Orlando: the shed checklist calls for a building permit and asks for the shed location, setbacks, size, height and surface calculations.Source ↗
  • Your city requires a permit for sheds above a certain floor area or height.
  • Your HOA reviews any new structure before you build.
  • The shed will have electricity or plumbing, or sits on a permanent foundation.
  • You need to confirm that the proposed shed location fits the setback and easement rules.

Six things to draw

  • Property lines with the length of each side.
  • The house and other existing buildings.
  • The proposed shed with its width and depth.
  • The distance from the shed to each property line.
  • A north arrow, a drawing scale and the property address.
  • A dashed roof outline where the eaves extend beyond the shed walls.

How to draw it

  1. 1

    Set up your lot from your deed dimensions, an address, or an uploaded plat.

  2. 2

    Add the house, then place the shed and type its exact size.

  3. 3

    Check the distances, preview the sheet, and export the PDF.

Common mistakes

  • Measuring from a fence. A fence is often not on the property line. Use your deed, plat or survey.
  • Forgetting easements. Utility and drainage easements often forbid structures. Check your plat.
  • Printing with "Fit to page". It changes the scale. Print at "Actual size".
  • Drawing the shed only. Reviewers also want to see the house and the driveway for context.

Measure the kit before you choose a spot

  • Measure the outside walls, roof overhang and highest point so you can apply the area and height limits your city actually uses.
  • Ask the permit office about plumbing or wiring before choosing a kit, and measure the narrowest gate on the delivery route.
  • Locate setbacks and easements from the survey, then show changed paving and where the new roof drains.

See a site plan sample

Check whether your permit requires a licensed survey before using this non-certified shed example.

Open the shed site plan PDF

Questions

Still stuck? Write to us.

[email protected]
Do I need a permit for a small shed?

It depends on your city. Many places exempt small sheds from a building permit but still apply setback and height rules. Ask your permit office, and your HOA if you have one.

How far must a shed be from the property line?

Your zoning code sets the number, and it can differ for side, rear and street-facing sides. Enter your local setbacks in the editor and it flags any distance that is too short.

Can I draw the site plan myself?

For many small residential projects, yes. Some cities ask for a survey or a stamped plan. Confirm with your permit office before you start.

Draw your shed site plan today

Free to draw and preview. No account. Pay $29 only when you want the clean PDF.