When you may need a permit
- Austin: a deck of up to 200 sq ft, no more than 30 in above grade anywhere, detached from a dwelling or townhouse, no dwelling egress, and outside a flood hazard area.Source ↗
- Houston: a deck of up to 200 sq ft and no more than 30 in above grade anywhere, detached from the dwelling and not serving its required exit door.Source ↗
- The deck attaches to the house or stands well above the ground.
- Your city requires a permit above a certain deck area or height.
- Your HOA reviews outdoor structures.
- The deck comes close to a side or rear property line.
Six things to draw
- Property lines with the length of each side.
- The house, with the deck drawn where it attaches.
- The deck width and depth.
- The distance from the deck to each property line.
- A north arrow, a drawing scale and the property address.
- Stairs, landings and the highest height above the ground.
How to draw it
- 1
Set up your lot from your deed dimensions, an address, or an uploaded plat.
- 2
Add the house, then place the deck and type its exact size.
- 3
Check the distances, preview the sheet, and export the PDF.
Common mistakes
- Sending only the site plan when the permit office has requested framing or footing details.
- Leaving out stairs. Stairs count toward how close the deck is to a property line.
- Ignoring lot coverage. Some codes count a deck toward the covered share of the lot.
- Printing with "Fit to page". Print at "Actual size" so the scale stays true.
Draw the edge, the stairs and the door
- Mark the door that serves the deck, any gap from the house, and the separate outlines of stairs and landings.
- Dimension the closest points of the deck, steps and landing to the relevant property lines.
- On sloping ground, show the greatest height above grade in a side view instead of measuring only at the door.
Prepare the other sheets separately
- Keep the site plan and framing sheet consistent on posts, footings, access and what stays in a replacement.
- Check utilities and easements before laying out footings, and ask the permit office how to count the deck in lot coverage.
- Print at actual size and check the scale bar after changing paper size.
See a site plan sample
Check whether your permit requires a licensed survey before using this non-certified deck example.
Open the deck site plan PDFCheck your city and calculate coverage
Questions
Still stuck? Write to us.
Does a deck need a permit?
Often, yes, especially when it attaches to the house or stands above a set height. Small low decks are exempt in some places. Ask your permit office.
Do setbacks apply to decks?
In most zoning codes they do, sometimes with a different number for uncovered decks. Enter your local setbacks in the editor to check.
Will this draw the framing plan?
No. This tool draws the site plan only. Framing and footing drawings are separate.