Not a licensed boundary survey.Do I need a survey?

SitePlanDesk

Pool permit guide

Pool Permit Requirements and How to Draw the Site Plan

San Diego exempts some prefabricated above-ground pools of up to 5,000 gallons from a building permit. The shell must meet the city’s conditions, and the barrier has its own rules. For a permanent pool, check which survey, structural plans and safety details your local office requires before hiring a crew.Source ↗

Start a site planFree · no account

For tracing only. Never printed.

When you may need a permit

  • San Diego: up to 5,000 gallons for a qualifying prefabricated pool supported on the ground, with its walls entirely above adjacent grade. See the occupancy and special-site conditions.Source ↗
  • Austin: the city lists a prefabricated pool less than 24 in deep in its work exemption page. Read the pool code reference and ask about the safety barrier separately.Source ↗
  • Florida: its barrier standard includes a minimum outside height of 4 ft where a barrier is used to satisfy the state safety rule.Source ↗
  • Orlando: its pool and spa checklist calls for a signed and sealed survey from a Florida-licensed surveyor and specifies the construction plans needed.Source ↗
  • You are adding an in-ground or a permanent above-ground pool.
  • Your city requires a barrier around the pool and wants to see it on a plan.
  • Your HOA reviews pools and equipment locations.
  • A pool contractor asks for a plan of the yard before quoting.

Six things to draw

  • Property lines with the length of each side.
  • The house and other structures.
  • The pool shape and size, and the equipment pad.
  • The distance from the pool to each property line.
  • The barrier fence and its gates.
  • Address, north arrow and scale, plus the deck edge or enclosure where it differs from the water line.

How to draw it

  1. 1

    Set up your lot from your deed dimensions, an address, or an uploaded plat.

  2. 2

    Add the house, then place the pool and type its exact size.

  3. 3

    Check the distances, preview the sheet, and export the PDF.

Common mistakes

  • Placing the pool over an easement or a septic field.
  • Leaving the proposed safety barrier off the plan. Check what your local office needs to see.
  • Measuring to the deck edge when the code measures to the water line, or the other way around.
  • Treating the site plan as the full permit set. Structural and electrical plans are separate.

Place the shell, deck and equipment one at a time

  • Draw the shell, waterline and paved deck separately, then ask which edge your permit office uses for setbacks.
  • Show the equipment pad and service clearance, and check the excavation access route before construction.
  • For a prefabricated model, use the manufacturer’s capacity and show surrounding grade where a slope meets the shell.

Check the barrier as a separate drawing problem

  • Trace the routes from the house and yard to the water, then mark the barrier, gates and existing sections that stay.
  • Keep the shell, paved deck and equipment separate in the coverage worksheet and confirm which surfaces count.
  • If the pool moves, review the gate, equipment pad and setback dimensions together before resubmitting.

See a site plan sample

Use the Phoenix labels for reference and check whether your permit office requires a licensed survey.

Open Phoenix’s pool drawing example PDF

Questions

Still stuck? Write to us.

[email protected]
How far must a pool be from the property line?

Your zoning or pool code sets the number, and it can differ from the building setback. Check before you choose a location.

Can I draw a round or oval pool?

Yes. Place a pool, then switch its shape to Round and type the width and depth.

Is an owner-drawn site plan enough for a pool?

Sometimes it covers the location drawing. Many cities also need engineered plans for the pool itself. Ask your permit office.

Draw your pool site plan today

Free to draw and preview. No account. Pay $29 only when you want the clean PDF.