Read the sheet from the outside in
- Find the street name, property address, north arrow, and scale before reading a building label. That orientation matters on corner or through lots, where the bottom of the drawing might face a side street and the edge you call the backyard might not be the zoning rear yard.
- Follow the property boundary all the way around. A boundary line defines the lot; a fence line shows where a fence stands. Show both when you have reliable information and the two differ. Give each distinct line a label or a legend entry.
- Find the outline of the existing home, then look for the proposed change. A reviewer should be able to tell at a glance whether the plan adds a shed, replaces a deck in the same location, or takes down an old structure before adding another.
- Read the numbers attached to the proposed object separately from the numbers running to the lot. A 12-foot wall describes the shed. A 5-foot line from that wall to a named property edge describes its location. Those example values explain the drawing, not a local rule.
What a residential site plan shows
- Property information identifies the parcel being reviewed. Use the address and, if the application requests it, the parcel number. A street address identifies the project but does not supply the dimensions of the lot; take those from a suitable property record.
- Use dimensions along each lot edge. Label angled edges or curves using the information on your source document. Drawing a rectangle from an advertised width and depth can shift the ends of an irregular lot and make the clearances appear larger.
- Show existing features that explain access and placement, including the house, driveway and structures that will stay. Where relevant to review, include easements, rights of way, and adjoining streets. Minneapolis lists streets, easements and distances among the features it asks applicants to show.
- Show proposed work with its own outline, its actual footprint dimensions, and distances to the relevant edges or buildings. A short legend helps when an existing structure, proposed footprint, setback line and easement would otherwise look like four similar outlines.
- Add notes or companion documents for anything the simple sheet cannot support. If the local checklist asks for a drainage exhibit or a separate utility plan, keep the geometry coordinated. A second sheet can carry the detail while the site plan shows where it belongs.
How reviewers use the distances
- Suppose a patio sits near a side boundary. The reviewer first needs to know which edge is the lot line and which edge is the patio. A clearance dimension between the two lets them compare the drawing with the rule that applies to the property.
- Setback and clearance mean different things on a working drawing. A setback describes a required separation. A clearance reports what is drawn. If the required line has not been confirmed, label the measured distance and leave the requirement for the planning desk to verify.
- Check the points used for dimensions. The near corner of a rotated building can be closer to the boundary than the center or the far wall. Ask which projection or feature counts if the roof overhang, stair or landing extends beyond the wall footprint.
- Keep area figures tied to the correct outlines. Building footprint, paved area and total lot area are separate quantities. A local office may count certain surfaces differently for zoning or drainage, so use its definitions before applying a limit from another worksheet or guide.
Pick the right companion drawing
- A floor plan shows the inside layout, including rooms and openings. A site plan puts that building in context. For an addition, the site plan can show how far the new wall sits from the lot line while the floor plan shows how it joins the living room.
- An elevation shows the outside face of a building from one side. It answers questions about height or exterior appearance that a top-down outline cannot answer. Point the reviewing office to the elevation sheet instead of trying to communicate every height with text on the site plan.
- Use a boundary survey when you need a professional to establish or resolve the location of property lines. The California surveying board describes retracing boundaries and setting property monuments as land surveying services. A site plan you draw using existing measurements does neither.
- Read the submittal checklist for your project before paying for a drawing. Ask whether an owner drawing is acceptable, which scale and paper size the office takes, and what other files are needed. Keep the office response with the application so it is available when a reviewer asks.
Check a draft before you send it
- Match street, address, and parcel details across your plan set. If a proposed deck is called rear deck on the application, use that label on the drawing. If you revise its size, change the drawn outline and the dimension together.
- Open the exported PDF separately and zoom in on the tightest cluster of numbers. Read the project clearance, scale, street name, and legend without reference to the editor. If two dimension lines cross, move a label or add a clearly keyed detail.
- When you print, use the actual-size setting and verify a known distance with a ruler. For a sheet marked one inch equals 20 feet, a straight 40-foot check span should print as two inches. Print fitting can change this even when the file itself is correct.
- Use SitePlanDesk for a non-certified drawing when the reviewer accepts one. You can start from lot dimensions or choose an address and trace from a reference. If a reliable nearby house estimate is available, it appears as an editable outline that you can correct or delete.
Questions
Still stuck? Write to us.
Do I need a site plan for a small project?
Ask the permit desk using the work type and address. A project may be small and still need placement review. Send the footprint and distances you expect before preparing a full plan set.
Is an aerial screenshot a site plan?
An aerial is a useful visual reference. A site plan adds identified property edges, dimensions, scale, and a clear description of the proposed work. Ask whether your reviewer accepts photos as supporting material.
Can I draw an owner-prepared site plan myself?
Some offices accept it. Austin Residential Plan Review, for example, says hand drawings may be accepted if legible, scaled, and complete for review. Confirm the requirements for your own project and jurisdiction.