Identify the kind of ADU first
- For a detached unit, show a separate proposed outline and measure its separation from the existing home and applicable lot edges. Show the path from the street or common driveway to the entrance when access is part of the review.
- For an addition attached to the home, distinguish original walls from the addition. Label the side of the existing building where the new work joins it. Keep the footprint and labels consistent with the building plans, especially where partitions or openings change.
- For a conversion, use the existing structure as the base. Label the portion being converted and distinguish a conversion within the shell from new exterior work. A garage door replacement or new entrance may affect details a separate drawing needs to show.
- Ask the reviewing office which application type covers the proposal. Provide the property address and the type of work. Do not apply a rule found for a detached new unit to an attached unit, an existing-building conversion, or another jurisdiction.
Draw the property and the new unit
- Start with verified boundary measurements and identify the street frontage. Show the main home and other structures with labels. Include a north arrow and use a scale that leaves enough space for the labels where the unit comes closest to a line.
- Draw and dimension the unit as it is intended to sit, including any steps, projections, or other features the checklist asks you to measure. Check whether a dimension is measured from the exterior wall, eave, landing, or some other point before you label it.
- Draw the usable approach to the unit, then mark its connection to a street, driveway, or yard access if applicable. Ask whether the application needs details on emergency access or parking. A dashed line by itself cannot tell a reviewer which route the plan intends.
- Identify easements and relevant utility or drainage features when the checklist requires them. Use records for locations you can verify. If the connection point or easement extent is unclear, ask the appropriate office before showing it as a fixed limit on the plot.
- Check your proposed and existing building dimensions against the building set. If an office requests an area table, follow its definitions for the numbers in that table. Ask how it wants any removed surfaces, paving or covered patios to be reported.
How two local checklists differ
- City of San Diego Information Bulletin 400 lists a site plan and vicinity map among its minimum ADU or junior ADU materials. It also separately lists floor and roof plans. Follow its linked submittal manual for the occupancy and project type that apply.Source ↗
- For an ADU using a Los Angeles approved Standard Plan, the city’s checklist pairs the approved unit drawings with a title sheet, area calculations, and parcel-specific plot plans. The standard design alone does not show the unit’s position on your parcel.Source ↗
- California’s housing department publishes an ADU handbook explaining state law. Read the current edition and check the local office’s plan checklist for the property. Rules or exceptions for a particular project should be verified with the jurisdiction before you draw required dimensions.Source ↗
- Do not copy a numeric setback or covering percentage from an example in either city. Ask the reviewer about the parcel’s rules, including any special district or overlay that might matter. Once confirmed, distinguish the governing setback from the actual clearance shown.
Check the submittal set before exporting
- For a backyard conversion, mark both the original driveway and the new route to the unit on the draft. Check where a visitor would turn after reaching the building. A dimensioned access line and an entrance label resolve an ambiguity that a generic rectangle called ADU leaves open.
- Make a list of requested companion sheets and record who is responsible for each. Match the project address and revision date across the application, site drawing and other plans. Put a separate detail in the place the checklist wants it instead of shrinking every item onto one small page.
- Read the PDF from the point of view of someone who has never visited the property. Find the main home, unit, closest relevant edges and access paths. Ask a second reader to name the smallest dimension without looking at the editor or your field notes.
- Use an owner-drawn sheet only if the office accepts it for the task. SitePlanDesk can help place the unit and show clearances when you have reliable measurements. It produces a non-certified site plan. Ask about any architect, engineer, or survey documents required for your project.
- When revising after a comment, change the geometry before changing the corresponding annotation. Recheck nearby dimensions and the other plans for consistency. Keep the current exported file and the written comment so the next reviewer can see how the issue was addressed.
Questions
Still stuck? Write to us.
Do preapproved ADU plans remove the need for a site plan?
Check the city’s program. Los Angeles’s ADU Standard Plan checklist still asks for plot plans specific to the property, along with a copy of the approved design.
Does converting a garage change what I draw?
Yes. Show the existing garage and the part being converted. If an addition or new access is part of the work, distinguish it. Ask your reviewer which other drawings or certifications apply.
Which setback should I use?
Ask the local planning office for the rule that applies to your parcel and ADU type. Label that rule separately from the actual measured offset on your project drawing.