California code and utility rules
- The commission places the 2025 Title 24 residential code on the January 1, 2026 cycle. For an earlier submission, ask the reviewing office which edition applies.Source ↗
- California’s Contractors State License Board directs excavators to notify the regional center at least two working days ahead. Check the statute and the center’s instructions for your work.Source ↗
- San Diego shows how a city adds its own site rules: the municipal residential zoning table gives setbacks by zone and includes footnotes for specific sites.Source ↗
Separate the code questions
Start with the permit address and ask whether the building department is a city or county office. Bring the rough project dimensions and the intended use. The state code edition is one question, the local amendment is another, and the way the city reviews your specific site is a third. Put those questions on separate lines so a useful answer about construction does not get mistaken for an answer about placement.
A coastal or hillside property is a good reason to ask about mapped conditions before making a final drawing. Show any steep grade, retaining wall and property corner you can identify from the record. Ask whether the local office needs an elevation, grading detail, or a signed survey. Give the reviewer enough room to see which feature you mean without stretching the drawing beyond the lot.
For an older permit or a project with a long pause between revisions, save the original application date. Ask whether the same code edition still applies before submitting the replacement plans. Keep the answer alongside the original permit documents so the homeowner, designer and contractor can refer to the same version.
Check the line you are measuring
Copy the property lines from a reliable record. Note the dimensions, add north and print a short draft to check that the measurements are readable. Trace an aerial photograph only as a visual aid. A canopy, wall or worn path on the image cannot show exactly where the line was recorded. If the property is unusual or a line is disputed, ask about the evidence your local office will accept.
For a shed, make it easy to compare the wall footprint with the roof projection. For a deck on sloped land, add a drawing from the side before committing to a height. For a driveway, show where pavement ends inside the lot and where access crosses a sidewalk. Clear labels make it easier to discuss one part of the project without changing the rest of the plan.
Ask your HOA for drawings and material details it requires, if your property has one. Keep HOA notes off the city submission unless they help explain the work or the local checklist asks for them. Set a reminder to follow up on the two reviews separately.
Organize the work before excavation
Keep a separate list of information needed from the local office. A reviewer can often answer a focused question from a rough sketch, even when the formal submission needs a different document. If you are unsure whether the proposal affects a public sidewalk, draw the curb and the work limits on that sketch.
Outline the excavation area in your notes. Include posts and utility trenches as well as foundation work. Use the applicable regional notification center instructions and wait for the required responses. Check whether a private line needs separate locating. If the layout moves after review, revisit the planned dig area before anyone starts. Keep the proposed location and the building permit record aligned.
Local permit offices in California
Questions
Still stuck? Write to us.
Is Title 24 enough to pick a location?
Ask the city or county for the zoning, local amendments and site restrictions that cover your address.
Can I submit only an aerial image?
Use imagery to orient yourself. Ask which survey or property dimensions to use for a scaled drawing and what supporting sheets the local office wants.