Texas code and utility rules
- Texas Local Government Code § 214.212 sets a municipal residential code baseline and allows changes by local ordinance. Ask the municipality which edition and amendments it enforces.Source ↗
- Texas Utilities Code § 251.151 generally requires notice at least 48 hours before digging, excluding Saturdays, Sundays and legal holidays. Confirm responses before work starts.Source ↗
- Austin publishes setbacks by district. Houston Planning says it has no zoning, and it reviews development standards and plat building lines. Use the city that actually reviews your lot.Source ↗
Identify the office for your lot
Start with the street address and the property description in your closing papers. Ask the city or county which office handles a new shed, deck or driveway at that location. Bring the property identification number if you have one. A mailing address and a town name on a listing are useful clues. The permit office can tell you what has jurisdiction over the lot.
For work inside a municipality, ask for the residential code and the local ordinance or handout that covers your project. Keep the two together. A code edition is useful for the design team, while a current city checklist explains which forms and drawings the reviewer wants. Ask separately about a city street or county road if a driveway will touch it.
Look for a recorded plat, easement notes and any private deed restrictions. Houston and Austin are useful examples because they start from different kinds of local land-use rules. A setback from one city guide will not determine the line for a property in the other city. If the lot is in an HOA, request its current instructions before you price the work.
Plan for rain, utilities and access
Sketch the route that rainwater takes across your lot. In an area that already ponds after heavy rain, a shed pad or wider driveway may cover part of that route. Mark the existing edge of the pavement and use a second line for the extension. Ask the reviewing office if it needs a grading or drainage sheet for the change.
Prepare the work area for the locate request. Describe the portion you will actually dig, such as the fence run, the deck footings or a new conduit from the garage. Call Texas811 early enough to complete the locate process before you schedule the work. Ask which private lines may need a separate locate. A utility locate serves a different purpose than a survey and does not establish the property line.
On the plan, show the lot dimensions, the existing buildings and pavement, the proposed work and the measured distances to the property lines. Add north and a printing scale. Keep any civil, structural or trade drawings separate where the office requests them. That makes it easier for someone to see the full site before turning to a detail.
Keep the code answer with the drawing
Save the city checklist and note which office answered each open question. Label the date and version on your drawing. If you need to move the work, review the setbacks, utility marks, drainage and submitted application together. Ask for a current survey or professional help if the records disagree or if your reviewer requests a signed drawing. Before submitting, compare the application description with what is actually shown.
Questions
Still stuck? Write to us.
Is the 2012 baseline the permit code in every Texas city?
Confirm the city’s current adopted edition and amendments. The state baseline does not tell you which local amendments or submittal rules apply.
Do HOA documents take care of permits?
Treat the HOA and public permit as separate reviews. Check each before starting work.