Orlando setbacks and permit thresholds
| Work or district | Limit | When it applies |
|---|---|---|
| Pool and deck placement | At least 5 ft to property lines | The city pool checklist gives this location measurement. Review easements, special districts and any separate equipment distances.Source ↗ |
| Shed placement | Confirm front, side and rear locally | Start with the city development standards and your exact district. The shed checklist asks for the rear and side distances and the height. Ask City Planning if the standards are unclear.Source ↗ |
| Whole lot impervious surfaces | 55% in R-1AA, R-1, R-1A, R-1N and R-2A | The worksheet lists 60% for R-2B and R-3A and calls for a separate check of the front setback area.Source ↗ |
| Shed exemption | The city shed checklist calls for a building permit | Do not apply another city’s size exemption. Check additional electrical or plumbing permits where applicable.Source ↗ |
| Qualifying fence exception | 6 ft or less where that height is allowed | Only under the full city conditions for one- and two-family sites. Materials and overlays matter. A required pool barrier or fence on a site with a rear alley can trigger review.Source ↗ |
Permit office and application
Use the city’s construction plan submission instructions. Orlando sends the digital applicant an invitation to upload plans to ProjectDox. For help, Permitting Services lists 407-246-2271.Source ↗
- The city lists a separate number for general permitting, 407-246-2271. Ask which documents belong in the digital intake for your specific project.Source ↗
- For a residential pool or spa, Orlando asks for a signed and sealed survey from a Florida-licensed surveyor. Check the city checklist before paying for a drawing to use as your submittal.Source ↗
Check the city and the zoning first
- Confirm city jurisdiction and zoning before using the Orlando worksheet, particularly near a lake or mapped floodplain.
- For a kit shed, bring the manufacturer’s installation and anchoring details, and use the survey for fence submittals.
Use the worksheet alongside the plan
- List existing, added and removed hard surfaces separately so an extension does not count the same pavement twice.
- Use the whole lot area for the lot-wide calculation and the front setback area for its separate check.
- Keep the worksheet and site plan in sync when you upload a revised drawing to ProjectDox.
Nearby cities and project guides
- Florida requirements
- Shed requirements
- Deck requirements
- Pool requirements
- Driveway requirements
- Lot coverage calculator
Working in another jurisdiction? Go straight to its permit office.
Questions
Still stuck? Write to us.
Does a tiny Orlando shed automatically qualify for an exemption?
The city’s published shed checklist calls for a building permit. Confirm with Permitting Services before ordering one for your address.
Why does the worksheet ask for two percentages?
It separates the whole-lot impervious calculation from the front setback calculation. Use the area shown for that part of the worksheet.
Can I submit a self-drawn plan for an Orlando pool?
You can use a sketch to plan the work. The city pool checklist calls for a signed and sealed survey and specifies what other plans to include.