Florida code and utility rules
- The state identifies the 8th Edition (2023) effective date and publishes the code cycle. Confirm with your permit office which edition applies to the application date.Source ↗
- Sunshine 811 directs callers to allow at least two full business days for ordinary on-land digging. Confirm the notice rules for underwater work or unusual excavation.Source ↗
- When a barrier is used to meet Florida residential pool safety rules, § 515.29 requires at least 4 ft measured from the outside and includes separate gate and opening requirements.Source ↗
- Orlando’s shed checklist asks for the shed height and dimensioned setbacks. It distinguishes manufacturer documents and installation details from plans for a custom shed.Source ↗
Map the project to the local checklist
Look up the address with the office you expect will review it. Find the checklist for the actual type of work rather than making a broad request for a homeowner permit. Write down the project scope, who will build it and whether it needs power or water. Use those notes to ask which documents need a signature or seal before you commission them.
For a prefabricated shed, save the specifications for the exact model and the anchoring instructions. Give the person helping you with the permit the name and model number from the paperwork. A catalog illustration may omit the base and fastening details. Match the floor dimensions on your location drawing to the ones on the manufacturer’s sheet. When the vendor changes the model, check the plans again.
On a property close to water, confirm the zoning and any mapped flood area. Sketch the top of bank, a low spot or any area that may be subject to extra review. Ask the local office which elevations or separate grading information it needs. If a surveyor or engineer is required, ask what documents they need before paying for a second drawing.
Keep pool and paving decisions visible
Sketch the pool shell first, then draw the deck, equipment and enclosure as separate elements. With the pool filled, a gate or an exit from the house affects access in ways you cannot judge from the shell dimensions alone. Identify those routes on the drawing and ask the local reviewer which safety features must appear on the application. For a covered porch or screen, label all work that changes the enclosure.
Prepare a separate table if the city asks you to calculate impervious surface. Show how you counted the existing hard surfaces and how the proposal changes them. A driveway extension over an old parking pad can be counted twice if you draw the new outline and leave all the old area in the total. Check the local definitions before counting a deck or a permeable material.
If an HOA reviews the project, ask about finishes, placement and any drawing scale it expects. Save its response separately from the permit, and give each reviewer the same proposed location. If one review moves the work, revisit the location before you lock in delivery or schedule trades.
Prepare the site before digging
Give Sunshine 811 the planned dig area with enough lead time. Show utility routes you already know about on the working sketch, then check the locate responses before work starts. Ask which private lines require separate locating. Use a new drawing version when the work moves so the contractor does not excavate to an outdated outline.
Questions
Still stuck? Write to us.
Do all Florida permit offices require the same site plan?
Start with the common state code and then ask the local office for the checklist, including any signed survey or engineered sheets.
Where should I start for a pool?
Use the local pool checklist for the submittal and review the state safety rule for the feature or barrier you plan to use.