Denver setbacks and permit thresholds
| Work or district | Limit | When it applies |
|---|---|---|
| Minor detached structure, street side | 5 ft | The city’s general Options A and B table shows this for the side street. Check the district and building form before using it.Source ↗ |
| Minor detached structure, rear and interior side | Rear 0 ft with abutting alley, 5 ft without | For an interior side, the table shows 0 ft when the structure is entirely in the rear 35% of the zone lot and 5 ft otherwise. Confirm front placement and all other requirements with Denver.Source ↗ |
| Detached shed building permit exemption | Up to 200 sq ft projected roof area | One story, non-conditioned and used for storage or a comparable purpose. Check the city guide for the 8 ft top-plate and 14 ft overall height limits and measurement from grade.Source ↗ |
| Post-hole-dug fence | Building permit above 8 ft | Denver distinguishes this from other fence and wall types, which trigger a building permit above 4 ft. Zoning and pool barrier rules are separate.Source ↗ |
Permit office and application
Denver Community Planning and Development provides E-permits. Use the city’s online permit instructions to identify the right application category and check what to attach before uploading a drawing.Source ↗
- Denver says the minor detached structure standards apply even where a project is exempt. Under Former Chapter 59, new structures, moves and alterations require a zoning permit.Source ↗
- Use the zoning code page to find the article covering your district and building form. Ask which code applies if an old record uses a designation you cannot match.Source ↗
Mark the zone lot and alley
- Check whether Former Chapter 59 applies before using the city’s minor detached structure guidance.
- Mark where the rear line meets a public alley, and ask how the zone lot is measured when the site includes several recorded lots.
Make the permit correction easy to find
- If the reviewer asks what lies beyond the rear line, add the recorded alley information and label the updated distance.
- Keep the roof height, grade and trade work consistent across the location sheet, elevations and application.
Nearby cities and project guides
Working in another jurisdiction? Go straight to its permit office.
Questions
Still stuck? Write to us.
Can I install a small Denver shed without a zoning review?
Denver’s guide describes exemptions and exceptions. Ask about your building form, historic status and whether the property is regulated by Former Chapter 59.
Will the alley affect where I can put a shed?
It can. Mark whether an alley directly abuts the rear zone lot line and cross-check the side and rear figures in the city’s guidance.
Does a site plan show enough for a fence on a wall?
A plan shows its position. A separate side view makes the wall, fence and grade visible so you can ask which height rule to use.