Colorado code and utility rules
- Denver’s official building code page lists the 2025 local codes, the underlying 2024 international codes and a separate energy code edition.Source ↗
- Colorado 811 tells residential excavators to submit their locate request at least two full business days before digging, excluding the day of notification. Review the responses before starting work.Source ↗
- Denver’s minor detached structure guide distinguishes an alley along the rear zone lot line from a rear line without an alley. Check your own local zoning table for the equivalent issue.Source ↗
Bring site conditions to the permit counter
Start with the city or county that reviews the address and ask which residential code edition it adopted. Then ask for the separate zoning rules or checklist that locates the work on the lot. If a regional building department handles construction, confirm which office checks the land-use questions. Save one name for each review so you know where to take a correction later.
Show both the house and the proposed work on a sketch. If the structure sits uphill or downhill of the house, label the grade changes you can see and ask what additional measurements the reviewer wants. A lot with a slope, a street below the house or an alley behind it often needs more explanation than a flat plan with a rectangle in the middle.
When you are working in an area with snow, high winds or wildfire exposure, ask which official design criteria and maps cover that exact address. Keep those parameters with the application. Avoid copying a load or distance from a drawing approved somewhere else. If you need a professional to translate the local criteria into a structural design, obtain that help before ordering materials.
Use a drawing that fits the project
For a detached shed, draw the wall outline, roof edge and nearest other structure or fence. Measure to the recorded property lines. An alley or access easement can change which setbacks apply. For a deck, sketch its posts, stair position and change in height above ground. For driveway work, label the uphill and downhill ends and show the route to the street.
Keep the proposed outline, scale and project name consistent across the site plan and the detail sheets. If a licensed survey is needed, provide it as its own document. Show private restrictions or HOA items that could change the plan’s location, but confirm the association’s review separately from the public permit process.
For excavation, give Colorado 811 a clear description of where you will work. Include separate dig areas, such as a post line and a service trench. Note where private lines may require another locate. Weather can affect scheduling, so ask the contractor to check the marks and responses before turning the drawing into a field layout.
Track changes before work begins
Before pricing work, pick the drawings that answer the questions about access, foundations and drainage. Discuss seasonal access with the contractor if a long, steep drive or a narrow alley serves the property. Small changes in the layout can affect how equipment reaches the site and where material is stored.
If a reviewer asks you to move the footprint, update dimensions to the lot lines and the location of any trench at the same time. Leave a brief record of the changes and keep the approved drawings available at the site. Check the version before handing a page to a contractor who has not seen the previous correction.
Questions
Still stuck? Write to us.
Does Denver’s code apply statewide?
Verify the local code for the address, including the edition, any amendments and the agency that reviews the work.
Should a Colorado deck drawing show slope?
Yes, where it helps the reviewer understand the project. Mark how the deck height changes and ask if it needs a separate elevation.